The first thing I am going to do now that I have the front walls framed out is run the wiring to two outlets and the lights for the living room. This will provide me with a better environment when I begin to frame out the rest of the alley wall. I already have the boxes for the outlets and light switches (I am going to make the stairwell a 4-way switch and add one next to the front door). I should be able to have this done by tomorrow night (Tuesday) and will post some pictures.
I guess I need to make a list of all the steps because posting them one at a time really doesn't seem like it will be too effective. Next step - create master list; look for that next time.
Subscribe to:
Post Comments (Atom)
1 comment:
I want photos!
Post a Comment