Showing posts with label basement. Show all posts
Showing posts with label basement. Show all posts

Wednesday, May 4, 2011

Some recent housework

I've been sporadically working on my house, but obviously haven't been posting anything up here about it. Lately, I've decided I want to have my kitchen ready for use by the end of the summer. This means having the walls framed out, new electric run, new gas lines, new water lines, new drainage, new ceiling and lighting, a window replaced, a new back door, new sub floor, the random brick chimney vent in the roof removed and the roof fixed. That's a lot to do and considering I really only work on it one day a week, I don't know if I'll get all that done, but I will have most of it ready.

I started by cutting off the water to the kitchen and removing the old iron piping that ran from the water heater to the back of the house (the 2nd floor bathroom is run with PVC). In the process of getting rid of that pipe, I learned that I didn't have to cut it, it could easily be removed at any joint by simply pulling on it. I don't know how clear the picture below is, but I removed both of the connecting pipes without any tools; it's almost completely rusted inside. Makes me happy I rarely used the kitchen sink and even gave Chloe water from a Brita. I also removed all the gas lines going to the back of the basement (Stove/Dryer) and the one that was going to my non-existent furnace.



I took out the ceiling in the kitchen (no pictures of that though) except for the light. The next step was to remove the floor. I made a decision that I was going to lay an entirely new subfloor because I wasn't sure what type of flooring I wanted and this would be the easiest way to be ready for what ever is decided. This is the back wall of the kitchen before I started doing anything.



The first section I removed was a huge pain in the ass because I didn't really know the best method of cutting everything up. The floor consisted of the original 3/4" hardwoods from who knows how long ago, a linoleum type floor directly on that, another thin subfloor with another layer of linoleum and finally a third subfloor with more linoleum. If you remember back to the beginning, there was also a layer of laminate wood floors on top of this. I ended up cutting the floor into square-ish pieces and pulling them up with a wrecking bar (my new favorite tool). I was able to get a decent amount done in a short time and was happy that I could easily see the results.



The joists seem to be in good enough shape to re-use, which is good because I had no intention of replacing them. I'm going to lay a temporary floor so I don't fall through, and hopefully be ready to lay the permanent floor in a couple weeks.

Tuesday, August 5, 2008

House Post #2 - Basement

Here are some pictures from the basement when I first bought the house. It is a lot different now because I got a new water line coming in from the street (the old one had several holes in it and was leaking water under the sidewalk in front of my house) and a new breaker box (the old one was manufactured by a company that no longer existed and you couldn't get new breakers or blanks to fill in the empty slots). I also have a bunch of stuff stored down there and have moved a lot of crap the old owner left into the back to get thrown out when I rent a roll-off dumpster thing.




Apparently this bathroom was the only one in the house until about 10 years ago. The toilet is under the stairs. Also, the black tube you see pointed into the tub is the drain for the washer and drier that are next to the tub.