Let's see … what order am I going to do the rest of the work on my house?
Here is my master list (in progress) … some of the stuff may seem out of order and may get re-arranged down the road, but this is how I envision it going right now:
1. Run electric to living room of house (4 outlets and 1 light switch)
2. Seal/fill the gaps and cracks in the chimney
3. Frame out the area around the chimney
4. Finish all the demolition in the open areas (not kitchen)
- a. Expose the remaining brick in the stairwell
- b. Expose the brick on the wall joining the kitchen and living room
- c. Expose the brick under the stairwell
- d. Remove the wall under the stairwell to the basement stairwell
- e. Tear up flooring
5. Have HVAC duct work installed
6. Frame out remainder of the alley wall
7. Level the ceiling in between the living room and dining room
8. Hang the living room ceiling
9. Drywall the living room around the chimney
10. Run electric to the dining room (# outlets TBD, 1 ceiling fan/light)
That’s really all I have right now. I guess I can't really call it a master list since I don't have everything planned and I am pretty much doing what I can until more money starts growing on the trees I planted out back.
My big thing is that I want to have all the demolition listed above finished by mid April so I can have it cleaned up and removed before Vanessa comes to visit at the end of the month. I also want to have the living room in a relatively finished state even if it's not being done in the typical order so I have something to look at and motivate me to do the rest.
This whole experience is a, learn as you go, do what you can, when you can type thing and I really wouldn't have it any other way … it just wouldn't be my style. Of course, if someone wanted to buy me a complete house, I wouldn't turn it down.
Tuesday, March 24, 2009
This Wasn't Planned
Since I'm a very impulsive person and I got an e-mail this morning regarding a pre-sale for tickets to a soccer (football) game being held at Ravens Stadium in July, I bought tickets.
Chelsea vs. AC Milan - Definitely a couple of great teams to watch.
I've never been to a professional soccer match and am definitely looking forward to this.
Chelsea vs. AC Milan - Definitely a couple of great teams to watch.
I've never been to a professional soccer match and am definitely looking forward to this.
Monday, March 23, 2009
As Promised, Step One of What Do I Do Now
The first thing I am going to do now that I have the front walls framed out is run the wiring to two outlets and the lights for the living room. This will provide me with a better environment when I begin to frame out the rest of the alley wall. I already have the boxes for the outlets and light switches (I am going to make the stairwell a 4-way switch and add one next to the front door). I should be able to have this done by tomorrow night (Tuesday) and will post some pictures.
I guess I need to make a list of all the steps because posting them one at a time really doesn't seem like it will be too effective. Next step - create master list; look for that next time.
I guess I need to make a list of all the steps because posting them one at a time really doesn't seem like it will be too effective. Next step - create master list; look for that next time.
I have a Wall ... or at least the framing of one
This weekend was very productive as far as moving forward with my house goes. In between endless amounts of college basketball and the BSG finale and football and volleyball, I (meaning mostly my dad with me doing whatever I could) were able to frame out the front wall and the section between the front and the chimney.
We built the small section between the front of the house and the chimney first because we didn't need to account for any windows or doorways and the floor and ceiling were pretty level. It was straightforward and didn't take very long to complete.

To make sure everything was flush against the floor, I pulled up the fake wood floors and got as much of the linoleum up as I could and scraped off the remaining residue. The original floor must have been pretty sweet, I am anxious to see what it looks like when I tear up the entire floor and get rid of all the linoleum. I am a sucker for hardwood with reddish coloring, my mom has Brazilian cherry hardwoods and they look great. For some reason I can't get this picture below to be in landscape so just turn your head sideways.

After measuring (and remeasuring) all the spacing between the walls and window and doorway, we (my dad) decided to make a Home Depot run and get two 10' studs for the top and bottom plates so we didn't need to connect shorter lengths. We also got some metal plates to attach the top plate to the joists. During our measuring, we found that the joist doesn't run parallel with the front brick and the floor is not completely level. We made sure when installing the frame that it would be plumb. This will allow me to use it as a point of reference when determining the final placement of the recessed lights. Now, for your viewing pleasure:



Oh, I forgot to mention that I had someone haul all the crap I had for $20. I replied to an ad off craigslist because they said the would take metal for free and I didn't really want to deal with transporting the 3 heavy radiators and iron piping to sell them for $50ish and then take the several bags of plaster (also heavy, and dirty) and the fake wood flooring and all that to a dump. I'll probably have them come back once I have finish doing all of the demo I plan on doing.
Now, I am going to document my next steps and hopefully set up some sort of timeline that I most definitely won't hold myself accountable to. I have to keep in mind that I am having a friend come visit for almost a week at the end of March and want my house clean for that portion of time. Tune in tomorrow (or quite possibly the next day) for the first of several installments of, "Where do we go from here?"
I also have to thank my dad for his help and his previous carpentry background. If it wasn't for him, I would not have paid as much attention to detail when ensuring the frame was plumb and level and probably would have built something unusable.
We built the small section between the front of the house and the chimney first because we didn't need to account for any windows or doorways and the floor and ceiling were pretty level. It was straightforward and didn't take very long to complete.

To make sure everything was flush against the floor, I pulled up the fake wood floors and got as much of the linoleum up as I could and scraped off the remaining residue. The original floor must have been pretty sweet, I am anxious to see what it looks like when I tear up the entire floor and get rid of all the linoleum. I am a sucker for hardwood with reddish coloring, my mom has Brazilian cherry hardwoods and they look great. For some reason I can't get this picture below to be in landscape so just turn your head sideways.

After measuring (and remeasuring) all the spacing between the walls and window and doorway, we (my dad) decided to make a Home Depot run and get two 10' studs for the top and bottom plates so we didn't need to connect shorter lengths. We also got some metal plates to attach the top plate to the joists. During our measuring, we found that the joist doesn't run parallel with the front brick and the floor is not completely level. We made sure when installing the frame that it would be plumb. This will allow me to use it as a point of reference when determining the final placement of the recessed lights. Now, for your viewing pleasure:



Oh, I forgot to mention that I had someone haul all the crap I had for $20. I replied to an ad off craigslist because they said the would take metal for free and I didn't really want to deal with transporting the 3 heavy radiators and iron piping to sell them for $50ish and then take the several bags of plaster (also heavy, and dirty) and the fake wood flooring and all that to a dump. I'll probably have them come back once I have finish doing all of the demo I plan on doing.
Now, I am going to document my next steps and hopefully set up some sort of timeline that I most definitely won't hold myself accountable to. I have to keep in mind that I am having a friend come visit for almost a week at the end of March and want my house clean for that portion of time. Tune in tomorrow (or quite possibly the next day) for the first of several installments of, "Where do we go from here?"
I also have to thank my dad for his help and his previous carpentry background. If it wasn't for him, I would not have paid as much attention to detail when ensuring the frame was plumb and level and probably would have built something unusable.
Wednesday, March 18, 2009
I'll be back more often, I promise
Yeah, so I haven't been posting much again, I think it's cause I have been busy at work and don't have my laptop set-up at home anymore. Random fun facts, in bullet form below:
- Got a lot of work done on the house in preparation for framing out the first wall this coming weekend (pictures will be provided)
- Went to a wedding Saturday, had a lot of fun and danced with an 83 year-old grandma that was probably around 4'10"
- Lost football again Sunday and realized no one believes I can throw the ball as far as I can cause they slow down and I overthrow them ... keep running
- Reached 100 at Mahaffey's and am now a part of the ultra-exclusive hundred beer club
- Only had 1 beer on St. Patrick's day (to reach 100) ... but that's 1 beer more than I had last year when I was in CT working overnight supporting an implementation in Singapore
- Playing indoor soccer tonight and volleyball tomorrow
- Working on my house Friday night through Saturday night ... as long as I can
- Considering going out and practicing with a Rugby team ... need to see if I can get an after-work job first though
Friday, March 6, 2009
More house work (but not much)
Wednesday's volleyball match went well and we defeated the other team fairly easily. Unfortunately, the game was early and I didn't have any time to work on the house because the team goes out after for some food and drinks. Last night I made plans to go to Pho Dat Thahn in Columbia and have my first pho experience; it was really good and I am looking forward to trying different places now. The plans weren't until 8 so I decided to get some simple work done.
I figured it would be easy to cut the iron pipes in the living room that were running to the radiator in the bedroom. Well, I guess I am just a dumb ass because it took about 30 minutes to get through one pipe (I was using a hacksaw because I didn't feel like spending money on something better). Halfway through the second pipe I gave up and decided to do something else until I got a better saw. The failed pipe cutting results:

I grabbed the crowbar and decided to see how well the plaster was adhered to the front wall. To my surprise, most of the upper portion came off very easily. I didn't want to get too dirty since I was going out to dinner, so I just pulled off the pieces that were loose and decided to move to the kitchen. Front wall:

I only had about 20 minutes before I had to leave to get to Pho Dat and decided to detach the radiator in my kitchen. That was easy, but moving it proved to be a lot more difficult for just me. The feet of the radiator were set into holes in the floor, which made me have to lift it out so that I could slide it over. It got done, and I amazingly didn't get dirty in the process. Now I am looking forward to the time when I have to clean that wall (as you can see below).


I picked up a reciprocating saw and a metal blade so I hope to accomplish a lot this weekend.
I figured it would be easy to cut the iron pipes in the living room that were running to the radiator in the bedroom. Well, I guess I am just a dumb ass because it took about 30 minutes to get through one pipe (I was using a hacksaw because I didn't feel like spending money on something better). Halfway through the second pipe I gave up and decided to do something else until I got a better saw. The failed pipe cutting results:

I grabbed the crowbar and decided to see how well the plaster was adhered to the front wall. To my surprise, most of the upper portion came off very easily. I didn't want to get too dirty since I was going out to dinner, so I just pulled off the pieces that were loose and decided to move to the kitchen. Front wall:

I only had about 20 minutes before I had to leave to get to Pho Dat and decided to detach the radiator in my kitchen. That was easy, but moving it proved to be a lot more difficult for just me. The feet of the radiator were set into holes in the floor, which made me have to lift it out so that I could slide it over. It got done, and I amazingly didn't get dirty in the process. Now I am looking forward to the time when I have to clean that wall (as you can see below).


I picked up a reciprocating saw and a metal blade so I hope to accomplish a lot this weekend.
Tuesday, March 3, 2009
Radiator #2 ain't got nothing
Day two of the radiator removal project happened to take a lot less time than I planned but involved a lot of effort. The radiator in my room is shorter than the one in the living room, but it is a little longer and felt about twice as heavy, probably because I had to get it down a flight of stairs. Other than the few dents in my stairs, it wasn't really that bad ... Newman and I just tipped it down and rocked it back and forth until we reached the bottom. I am not sure what I am going to do with the extra space in my room, but now my bed frame will fit without having to worry about it getting scratched by the radiator.

Pre-removal

Post-removal

That's a lot of iron
My next step is to remove the radiator from the kitchen and then start cutting the pipes and taking those out. I'm not going to be able to do that tonight since I am going to the Terps - Wake Forest game. The next chance I'll get to work on it is Thursday because of volleyball tomorrow, but maybe if I don't go out after the match (or don't go out for too long), I'll be able to do part of it.
I am going to leave the radiator in the basement for a while because there is no way I am carrying that up the stairs. I'll take it out the back and bring it through the alley whenever I decide to take the radiators to the scrap yard.

Pre-removal

Post-removal

That's a lot of iron
My next step is to remove the radiator from the kitchen and then start cutting the pipes and taking those out. I'm not going to be able to do that tonight since I am going to the Terps - Wake Forest game. The next chance I'll get to work on it is Thursday because of volleyball tomorrow, but maybe if I don't go out after the match (or don't go out for too long), I'll be able to do part of it.
I am going to leave the radiator in the basement for a while because there is no way I am carrying that up the stairs. I'll take it out the back and bring it through the alley whenever I decide to take the radiators to the scrap yard.